What role does the hourly rate play in the budget?

This continues to spark debate. The rules states that the hourly rate cannot be set (CPR 3 PD 3E, para 7.10), but further explain that the constituent elements of the budget should be considered when assessing the amount to approved (CPR 3 PD 3E, para 7.3). So, with the hourly rate falling under the umbrella of a ‘constituent element’ the hourly rate can be taken into account, but importantly, not fixed. There will usually be a number of factors that contribute to a reduction of the budget and on occasions the level of the hourly rate may be one of those contributing factors.

Parties are often working blind in respect of the logic that the case management Judge applied. If the court did take the hourly rate into account when reducing the amount of estimated costs sought, and no evidence exists to support the Judge’s thought process, what happens when the costs are finally assessed?

At the moment there is conflicting case law in this regard.

In RNB v London Borough of Newham [2017] EWHC B15 (Costs) Deputy Master Campbell said “If (as it is the case) the hourly rate is a mandatory component in Precedent H which is not and cannot be subjected to the rigours of detailed assessment at the CCMC, it makes no sense if it is automatically left untouched when the rates for the incurred work are scrutinised at the ‘conventional’ assessment.”

“Such an approach would offend against the guidance given in Harrison at paragraph 44. Indeed, as [counsel for the defendant] points out, it is only on that occasion that a paying party has an opportunity to challenge the rate.”

This was therefore a “good reason” to depart from the costs allowed in the claimant’s last approved budget.”

However in  Nash v Ministry of Defence [2018] EWHC B4 (Costs) –  Master Nagalingam found that “a reduction in hourly rates of the incurred costs is not a good reason to depart from the budget in respect of the budgeted (future) costs”.

And finally, in Jallow v Ministry of Defence [2018] EWHC B7 (Costs) Master Rowley found “that there is no good reason to depart from the budget by virtue of the reduction to the hourly rates in this case”.

How can the legal profession employ the rules as currently drafted? Is it possible to gain clarity and a clearer view of the blind logic/working approach adopted by the Judges? If, during the course of the CMC, the Judge does comment on the hourly rate, ask him/her to record a note on the case management order that the hourly rate was considered when approving the budget and that it played a role in the reduction to the rates.

You can find out more about our services here or you can contact the Costs and Litigation Funding team at CivilCosts@clarionsolicitors.com

Various Claimants v MGN – Some much needed clarity!

Bespoke budgets in multi-party litigation, proportionality, updating the incurred costs included in the budget prior to the CCMC, including the costs of interim hearings in the budget, disapplying the 2% cap for costs management and the resourcing of fee earners were all points that were dealt with at the most recent CCMC in the latest phone hacking cases (Various Claimants including (1) John Leslie (2) Chantelle Houghton v MGN Limited [2018] EWHC 1244 (Ch)).

MULTI-PARTY LITIGATION – The court’s approach to this multi-party litigation avoided the need for multiple costs management hearings for similar claims. The court applied a structure that was similar to a GLO and directions were made regarding managing the costs of the claim. Common and individual costs were split, and Costs Management was dealt with by the application of template budgets for individual costs and common costs. There were 3 categories of claims for the individual costs and the court could order that there be bespoke individual budgets in place of the template budgets. In this decision the court agreed that bespoke budgets were applicable to two of the Claimants, Leslie and Houghton.

THE BUDGET AND PROPORTIONALITY – Chief Master Marsh applied the proportionality test to the Claimants’ budgets commenting that “I would emphasise that the court is not required to have regard to the constituent elements of each budget phase (it may do so) and the court’s task is to decide whether the total for each phase falls within a range of reasonable and proportionate costs…. And the court is not looking to establish what the budget figure should be objectively ascertained, but rather a figure that falls within the applicable range applying the reasonableness and proportionality tests alongside each other.”

“The court must apply both the reasonableness and proportionality tests, but the former may yield to the latter. And, in practice, although PD3E, paragraph 7.3, requires the court to consider each budget phase separately, and therefore to consider the proportionality of each phase total, the task has to be undertaken with an initial overall review of proportionality by reference to the factors in CPR44.3(5)…

The costs in the budget phases must not only be reasonable but must also bear a reasonable relationship with the proportionality factors I have indicated. The proportionality factors that are relevant are to be taken together and given notional weight as a whole. In these cases, the sums in issue are not large for High Court claims when taken in isolation. But when the proportionality factors are put together, the financial value of the claims proves to be relatively unimportant because of the wider factors. The budgets substantially exceed the sums in issue but is not a reason to conclude that the overall budgeted sums and the totals per phase are disproportionate.

It seems to me that the wider factors I have summarised, in particular the public importance and test case factors, will have the effect that if the costs are reasonable they are proportionate. That conclusion chimes with the approach the parties have adopted and avoids the court wielding a concept of uncertain application.”

UPDATING INCURRED COSTS – There was a considerable time period between the date that budgets were required to be filed and when the CCMC was listed. Mr Leslie updated his budget prior to the CCMC to include incurred costs up to 1 May 2018, however the other parties did not. The Master recognised the problems of one party updating the incurred costs and the other parties not, explaining that this approach resulted in Mr Leslie having “ousted the court’s jurisdiction to consider a significant amount of expenditure” and consequently found that “the relevant date for the purposes of incurred costs as being 17 January 2018.”

This can be avoided by agreeing a date that the incurred costs are included up to and in turn obtaining the court’s permission to update the incurred costs.

HOURLY RATES – Chief Master Marsh refused to be drawn into the debate regarding hourly rates and instead considered the allocation of work in the budget between different grades of fee earner and the total figure claimed for each phase was of greater importance.

INTERIM HEARINGS – An amount for specific disclosure had been included in the disclosure phase, the Master found that the inclusion of interim hearings in the budget were wrong in principal as they may be subject to an inter partes costs order, the costs were moved into the contingency phase.

COSTS MANAGEMENT COSTS – The costs associated with costs management are subject to a 2% cap. Chief Master Marsh was asked to consider lifting the cap, he agreed on the basis that the complexities surrounding the multi-party litigation warranted exceptional circumstances in this case.

You can find out more about our services here or you can contact the Costs and Litigation Funding team at CivilCosts@clarionsolicitors.com

The format of the precedent H budget and precedent R are working well, claims Mr Justice Birss

At February’s Civil Procedure Rules Committee meeting Mr Justice Birss reported that “work was ongoing to make certain that the new bill costs, Precedent H and Precedent H Guidance are consistent and accurate and that N260 the summary costs statement follows the same format. The content of Precedent H itself would not be changing. The Chair added that in his experience having settled down, Precedent H and R are working very well“. Therefore no changes are expected to the precedent H budget or the precedent R budget discussion report, the remaining changes relate to the bill of costs and statements of costs.

The wholesale changes to costs that we have encountered over the last 5 years were made as a result of Sir Rupert Jackson’s report whereby he likened the current bill of costs to a “Victorian style account book” making it “relatively easy for a receiving party to disguise or even hide what has gone on”. His purpose was to create transparency and unison with time recording systems and costs related documents, hence the need for the new electronic bill of costs, which is the final piece of Jackson’s jigsaw.

If the legal profession were to embrace time recording as Jackson intended, i.e. recording time in phase, task and activity, then astonishingly some 5 years after the publication of his legendary reforms, Sir Rupert Jackson may achieve his aim. However, Sir Rupert narrowly missed having his vision fully formalised and embedded into the rules during his working lifetime, his retirement has pipped him to the post.  He can now sit back and watch from afar, how his intended co-ordinated approach to costs will work in reality!

You can find out more about our services here or you can contact the Costs and Litigation Funding team at CivilCosts@clarionsolicitors.com

The practical effect of the Harrison budgeting decision

In the eagerly awaited decision in Harrison v University Hospitals Coventry & Warwickshire NHS Trust [2017] WECA Civ 792 (see article, page 8), the key findings of the Court of Appeal were that (1) budgeted costs will not be departed from in the absence of a ‘good reason’; (2) incurred costs do not form part of the budgeted costs; and (3) the good reason test does not apply to those incurred costs. So, what does this decision mean in practice, and what further observations can we make?

Of particular interest is how the courts will deal with ‘incurred costs’. During the Court of Appeal case, the court’s attention was drawn to incurred costs when the respondent presented what was described by Davis LJ as ‘an ingenious argument’ regarding incurred costs being potentially approved ‘through the back door’ at the budgeting stage. The respondent submitted that: ‘The incurred costs will have acquired a special status: in that, while not “approved” as such, they will have been taken into account by the court at the costs management hearing in managing the future estimated costs.’ Please click here to read the full article.

Joanne Chase is a Senior Associate at Clarion. You can contact her at joanne.chase@clarionsolicitors.com or on  0113 336 3327.

Fixed Recoverable Costs – the pilot scheme

Following on from my newsletter below, the Civil Procedure Rule Committee meeting notes have been published today. Last month I explained how Jackson LJ had suggested how ‘capped fixed costs’ would work. The meeting notes have now confirmed how the pilot scheme will work, explaining that costs for preaction would be capped at £10,000, for particulars of claim at £7,000 and for defence and counterclaims at £7,000.

Many thanks to John Hyde of the Law Society Gazette who has reported that “Parties can claim up to £6,000 for a reply and defence to the counterclaims, £6,000 for the case management conference, £6,000 for disclosure and £8,000 for witness statements. Expert reports are capped at £10,000, with the trial and judgment costs limited to £20,000.

The working group dedicated to the pilot scheme proposes an overall cap of £80,000 rather than setting an actual fixed amount at this stage.

The proposal, backed in principle by the committee, is to run the pilot in certain specialist civil courts: the London Mercantile Court and three courts in each of the Manchester District Registry and Leeds District Registry. Any cases where the trial will go beyond two days, or where the value is more than £250,000, are excluded“.

Clarion May 2017 Newsletter: Fixed Recoverable Costs. A taster of how the pilot scheme may work.

The judiciary have released an outline regarding how the fixed recoverable costs regime may work. Jackson LJ attended a costs seminar in Birmingham back in March 2017, which focused on mercantile and business litigation. At that seminar both Jackson LJ and HHJ Waksman outlined their proposals for the fixed costs pilot scheme, those proposals being subject to the approval of the Civil Procedure Rules Committee. The details of their proposals were as follows:

The pilot scheme will run in the London Mercantile court, and Manchester and Leeds specialist courts.

  • It is likely that the pilot will commence in October 2017 and will last for two years.
  • The pilot scheme is optional.
  • There will be a separate fixed costs list.
  • The pilot can be joined at certain stages:
    • The pre-action stage
    • No later than 14 days after service of the defence
    • At the case management conference (CMC)
    • Claimants can commence proceedings in the fixed costs list.

The Defendant has an absolute right to object to this, and if so then the proceedings would be removed from the fixed cost list.

  • The CMC will be the last opportunity to join the pilot.
  • Parties will not be able to withdraw from the pilot, apart from the Defendant if the Claimant issues in the pilot scheme (see above).
  • There will be a shortened process with strict case management .

The pilot is currently a ‘work in progress’, however it is envisaged that these proposals will be making their way to the Civil Procedure Rules Committee in June 2017, so these could be public by July 2017. It is currently predicted that:

  • Parties will be required to file their “core documents” (the documents that are relevant to the issues in the claim) with their statements of case, i.e. the particulars of claim, defence, reply and defence to counterclaim.
  • There will be no need for further disclosure, unless parties can justify this at the CMC.
  • If further disclosure is required, parties will need to apply for the same before the CMC. If the parties cannot agree, an order will be made.
  • At the CMC, the judge will suggest Alternative Dispute Resolution (ADR), including Early Neutral Evaluation (ENE).
  • The CMC will be the only interim hearing, this will include setting the trial timetable.
  • Consideration is being given to limiting the number of witnesses, the thoughts are that there will be one factual witness on each side.
  • Costs budgeting will not be required and there will be no pre-trial review.
  • The trial length will be up to two days (excluding judicial reading).
  •  Cross-examination will be “very strictly controlled”.
  • An early hearing date will be guaranteed.
  • Judgments will be produced within a short period of time.
  • Pilot participants can expect “active and proactive” case management.
  • Costs will be summarily assessed at the end of trial.

The above proposals were made in March 2017, however since then there have been further proposals, as follows:

  • The pilot will only relate to claims that are less than £250,000.
  • The pilot will only relate to claims where the trial is no more than 2 days.
  • The pilot will only relate to non-complex matters.
  • The maximum costs that will be allowed will be £80,000. The pilot scheme will be similar to the IPEC costs regime. There will be caps for phases of litigation and those phases will be the same as the phases used in costs budgets.
  • Parties can only leave the scheme under exceptional circumstances, examples of those circumstances are; allegations of fraud, if the matter subsequently is listed for a 3 day trial.
  • Judgment will be handed down within 6 weeks.
  • The proposed ‘grid’ is not yet available and it is likely that this will not be available until the practice directions are published, so it may make its way into any July update to the rules. The main benefits of the pilot scheme are that claims will be resolved speedily and parties will be more aware of their potential costs exposure.
  • We will continue to provide updates regarding fixed costs, as well as all costs related law.

You can find out more about our services here or you can contact the Costs and Litigation Funding team at CivilCosts@clarionsolicitors.com

 

“Costs budgets are now working better.”

At this years’ APIL conference it was said that “Costs budgets are now working better”.

Thanks to Gordon Exall and Rachel Rothwell for tweeting interesting and salient comments and quotes made at this years’ APIL conference. Those tweets included – “Harrison is coming any day”, “Merrix may largely be upheld with clarification of incurred costs”, “costs budgets are now working better”………  To read a few of those comments please click here.

Thanks again to Rachel and Gordon for their continued devotion to provide updates
on costs law.

You can find out more about our services here or you can contact the Costs and Litigation Funding team at CivilCosts@clarionsolicitors.com

Calling trumps: how the court has laid its cards on the table over costs management.The interaction between costs budgeting and costs assessment – Merrix v Heart of England NHS, the appeal of the first instance ruling.

The interaction between costs budgeting and costs assessment has been considered again in Merrix v Heart of England NHS Foundation Trust [2017] EWHC 346 (QB) – the appeal of a first Merrix v Heart of England NHS instance ruling.

Mrs Justice Carr found that the court will have ‘regard to the receiving party’s last approved or agreed budget by respecting it or finding that there is a good reason to depart from it. So, the question to be answered is – will a receiving party’s costs
be allowed in full if they are less than the budget? Yes – for now! The Merrix decision confirms that any departure from the budget applies to both downward and upward revisions, hence parties have to show a good reason to depart from the budget.

Does Mrs Justice Carr’s finding in Merrix deny the paying parties an opportunity to challenge potentially unreasonable costs, despite it being their responsibility for the costs of challenging those costs? At the moment – yes.

Is it ‘just’ for the receiving party to request their costs in full simply because they have been incurred and fall within the parameters of the budget? What safety mechanism is in place to ensure that any receiving party does not include unreasonable and disproportionate costs in their claim for costs, simply justified on the basis that they ‘fall within budget’?

Mrs Justice Carr felt that the indemnity principle was sufficient, though perhaps it is not – unreasonable costs can be claimed from the client, hence the need for Solicitors Act assessments. Or alternatively, the client may have little regard to the constraints of the budget and request that ‘out of scope’ or disproportionate and unreasonable costs are incurred in any event.

How can restraints be imposed on a spendthrift client with deep pockets, and at the same time discourage a paying party from being overzealous in their requests for detailed assessment? Perhaps the introduction of the ‘one-fifth rule’ to costs budgeted cases could be the answer. This shares the burden of the costs consequences, rather than the traditional costs shifting rule. If the bill is reduced by more than 20%, then the receiving party is responsible for those costs rather than the paying party, but if the paying party secures less than a 20% reduction to the bill, then they become responsible for those costs.

This should encourage all parties to think seriously about committing to detailed assessment, rather than the onus being on the paying party. Not only does this tie in nicely with the rules for Solicitors Act assessments, but it is also in line with the rules surrounding provisional assessment relating to the recoverability of costs for an oral
hearing (see article, page 10). Further, it embraces Jackson’s intention to reduce the number of detailed assessments, and at the same time does not deprive parties the opportunity to challenge the costs. Just a thought.

Is this the end? Perhaps only for now. Mrs Justice Carr requested that if this decision were to be appealed, then it should be heard together with any existing listings covering the same point of principle.

In her decision, she referred to Harrison, which was soon to be heard in the Court of Appeal. The Harrison decision is listed for May, and so the paying party in Merrix may be running out of time to get this listed together with Harrison – but we await with interest.

Please click here to read the full article which was published in the April edition of the Litigation Funding magazine.

Anna Lockyer is an Associate at Clarion. You can contact her at anna.lockyer@clarionsolicitors.com or on 0113 288 5619.

Merrix v Heart of England NHS Foundation Trust [2017] EWHC 346 (QB) – On appeal, Mrs Justice Carr confirms that the good reason test to depart from a budget relates to both downward and upward departures.

Merrix v Heart of England NHS Foundation Trust [2017] EWHC 346 (QB) – On appeal, Mrs Justice Carr confirms that the good reason test to depart from a budget relates to both downward and upward departures.

The inter-action between costs budgeting and costs assessment has been considered again in the appeal of the case of Merrix v Heart of England NHS Foundation Trust [2016]. DJ Lumb found that:

It is not helpful in the context of this debate to consider “departure” within the meaning of CPR 3.18 as being upwards or downwards. It is important to understand that the departure refers to a departure from the budget not from a fixed sum. Just because a party has incurred costs that come in at under the total for a phase is not a departure from the budget. Applying the ordinary meaning of the words the party is still within the budget unless or until the Court revises the budget. It is not the replacement of one fixed sum with another fixed sum. The purpose of the form Precedent Q is to set out the differences between the actual expenditure and the budgeted figures for each phase. It is not intended to be some advanced assessment of the recoverable costs. If having completed a line by line assessment of the reasonable costs the Court considers that the costs are still disproportionate, the Precedent Q could be a useful breakdown for the Court to use to make adjustments to ensure the resulting figure is proportionate”. 

DJ Lumb concluded that the budget and the bill of costs were different tools for Courts to manage costs, which were applied at different times. Consequently, despite the cost claimed being less than the budget, DJ Lumb (Regional Costs Judge) ordered that detailed assessment was appropriate.

This decision has been appealed to the High Court and the appeal has been allowed, with Mrs Justice Carr finding:

“In my judgment, the answer to the preliminary issue is as follows: where a costs management order has been made, when assessing costs on the standard basis, the costs judge will not depart from the receiving party’s last approved or agreed budget unless satisfied that there is good reason to do so. This applies as much where the receiving party claims a sum equal to or less than the sums budgeted as where the receiving party seeks to recover more than the sums budgeted”.

This decision now falls in line with LJ Jackson’s report and the cases of Slick Seating and Safetynet. In 2012, in the case of Safetynet Security LTD v Coppage [2012] EWHC B11, HHJ Simon Brown QC stated that “since the Claimant’s costs were within the budget approved by the court, a detailed assessment would be an unnecessary and expensive course of action to take”. Costs were awarded in the Claimant’s favour, in the amount of the budget. Later in the case of Slick Seating Systems & Ors v Adams & Ors [2013] EWHC B8 (Mercantile), HHJ Simon Brown QC observed that the Claimant had “laudably kept within the budget and exercised due control over their activities and expenditure in an exemplary fashion” and that their budget was proportionate to what was at stake, he awarded the claimant their costs as claimed.

LJ Jackson’s view of how cost budgeting would work was explained at Chapter 40 1.4 (iv) of his report:

“At the end of the litigation, the recoverable costs of the winning party are assessed in accordance with the approved budget

And at Chapter 40 1.5 of his report:

“Issues for consideration. If costs management becomes a feature of civil litigation in the future, many issues will have to be considered before any set of costs management rules is drawn up. In particular: (iv) In so far as the last approved budget is binding, should it operate as an upper limit upon recoverable costs or should it operate as a form of assessment in advance? “

At Chapter 45 of his final report the Law Society noted that:

”If the costs management proposals set out in the Preliminary Report are accepted, it would seem that detailed assessment will have a place only in the context of cases where RP’s costs significantly exceed the budget”. The Commercial Litigation Association (“CLAN”) believed that “detailed assessment will become less common if costs management is adopted”.

That said, the case of Troy Foods v Manton [2013] EWCA Civ 615, Lord Justice Moore-Bick warned that an approved budget is not a licence to conduct litigation in ‘an unnecessarily expensive way’. He added that: “I do not accept that costs judges should, or will, treat the court’s approval of a budget as demonstrating, without further consideration, that the costs incurred by the receiving party are reasonable or proportionate simply because they fall within the scope of the approved budget.”

So, the question to be answered is – will your costs be allowed in full if they are less than the budget? Yes, unless parties can show a good reason to depart from the budget – Merrix  now confirms that this applies to both downward and upward revisions to the budget.

You can find out more about our services here or you can contact the Costs and Litigation Funding team at CivilCosts@clarionsolicitors.com

Costs Budgeting is essential”, hails LJ Jackson.

“Costs Budgeting is essential”, hails LJ Jackson.

Jackson told a London Common Law and Commercial Bar Association event last night that:

“Costs budgeting is an essential element of any programme to make the costs of litigation proportionate”, and that:

Litigation is a commercial enterprise.’  He added ‘there are no other commercial projects which people enter without a budget” and that “some form of costs management or costs budgeting is essential.’ This echoes comments he made in his 2009 final report.

In Jackson’s final report in 2009 he said “Any measures to control the costs of a project are themselves a source of some expense. Quantity surveyors have to be paid professional fees for their services in monitoring the costs of a construction project and determining what amounts are payable at each stage or what sums are due in respect of variations. But no-one suggests that quantity surveyors should be dispensed with, in order to “save” the costs of employing them. The costs of any multi-track case can be substantial, ranging from tens of thousands of pounds to tens of millions of pounds. In other words, the costs of every multi-track case, unless it settles early, are comparable to at least the costs of a small building project and sometimes they are comparable to the costs of a major building project. There is precisely the same need to control the costs of litigation as there is need to control the costs of any other project”.

After 7 years since his report was written, 1 pilot scheme and the 3 year practical application of the amended Civil Procedure Rules, Jackson’s opinion on both the effect of costs management and the costs of the same, remains constant.  Costs Management works and the costs of the same are a sensible part of the ‘project’.

Please follow this link to the Law Society Gazette’s article.